Roundabout Construction Schedule?
Roundabout Construction Schedule?
We will be in STJ in June and was wondering if the roundabout where the Texaco station is will be under construction by that time. I'm hoping that we will avoid that as I'm sure that's going to be a HUGE PAIN to deal with. Knowing how slow island time runs this project will probably be pushed into 2008. Does anyone have an educated guess??
- silverheels
- Posts: 890
- Joined: Thu Aug 10, 2006 10:18 am
- Location: The Nutmeg State
Roundabout 'nightmare'
The 'nightmare' would happen if they close the intersection.
As it is now, Centerline breaks off to go to the south shore, or up the hill and down the back of crest of the island. You also have traffic from the old barge port coming up past Boulon.
If they close the intersection, all the south shore traffic is either going to go through the Enighed Pond roads (would they possible think we should drive from toewn along the road past Gallows and then out to south shore?) ...
I have to think they'll do it by flag people, making an access lane one way, alternately.
You don't want to be downtown at 4pm ... I can tell you that.
As it is now, Centerline breaks off to go to the south shore, or up the hill and down the back of crest of the island. You also have traffic from the old barge port coming up past Boulon.
If they close the intersection, all the south shore traffic is either going to go through the Enighed Pond roads (would they possible think we should drive from toewn along the road past Gallows and then out to south shore?) ...
I have to think they'll do it by flag people, making an access lane one way, alternately.
You don't want to be downtown at 4pm ... I can tell you that.
Frank Barnako